Event Details

Occupational Safety and Health Visit Sharing of safety aspects at CV/2013/08 - Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 6

Date: 9 December 2017 (Saturday)
Time: 10:00 a.m. - 12:30 p.m.
Venue: Liantang/Heung Yuen Wai, N.T.
Assemly: All participants should meet at the MTR Fanling Station Exit A at 9:30 a.m. for registration. The shuttle bus will leave at 9:45 a.m. Please be punctual.
Organizer(s): IOSH Hong Kong
Language: Cantonese (supplementary with English)
Contact Person: Raymond Man
Contact Email: mailbox@ioshhongkong.com
Contact Tel: 9025 6767
CPD: 2.5 hours
Content: Contract No. CV/2013/08 - Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 6 The works include construction of a 4.6 km long dual two-lane trunk road (with about 0.6km at grade roads, 3.3km viaducts and a 0.7 km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works. The objective of the visit is for members to observe the latest lifting frames for segmental bridge construction. In addition, the Guidelines on Safe Use of Lifting Frames and Launching Girders for Bridge Construction have been published by the Labour Department, in consultation with and support of the Development Bureau, the Highways Department and the Civil Engineering and Development Department. Contractor: CRBC-CEC-KADEN Joint Venture
Remarks: The participants should bring their own safety helmets, highly visible vests, safety shoes for the site trip.

Registrations Details:

We are sorry that the event is full. Please contact for registration details.